5th Recycling Waste Collection at Admin Building KLIA!
Posted by arisoziar on May 25, 2011
Today 3.2 tonnes of waste was collected for recycling at our KLIA complex. 2.7 tonnes from the Administration building and 463kg from the Engineering Material Management Department. Engineering is a high security area and last time around, the Alam Flora truck couldn’t get in! So this time, Rosila from Corporate Safety Oversight jumped into the truck to make sure they got in!
That’s Shila (as we call her) in blue below, seconds before she comandered the truck. A tireless champion for the environment.
And guess what I found when I peeped into a bag that looked way to heavy to be paper by the way the workers were barely dragging it along…



